Work schedule / Example

From the first month
to to moving in.

A standard schedule for a 400 m² property from the company catalogue. Actual durations depend on the project and are agreed separately.

01 / monthInitial data

Initial data collection, design and cost documentation, and paperwork.

02 / monthEngineering

Development of interior and exterior designs.

03 / monthPreparation and foundations

Site preparation, excavation, foundations, slab and basement plastering.

04 / monthStructure

Structural works, brickwork, anchor ties, slab and wall plastering. Site fencing.

05 / monthSecond floor and roof

Second-floor structure, brickwork, anchor ties, slab, wall plastering and roofing.

06 / monthSystems and fittings

Ventilation and ceiling cladding. Ordering furniture, windows, doors, gates and wrought-iron items.

07 / monthWindows

Window installation. Continuing building services and finishing works according to schedule.

08 / monthGates

Installation of gates and wrought-iron items.

09 / monthFinishing works

Continuing utilities installation and exterior finishing.

10 / monthDoors and furniture

Door installation, stair landing cladding and furniture fitting.

11 / monthDoors and furniture — continued

Door installation, stair landing cladding and furniture fitting. The original diagram shows these works in a shared block for months 10–11.

12 / monthHandover

Landscaping, home furnishing, disinfection and final cleaning, and completion of documentation.

Text version of the stages in the catalogue, pp. 7–8. Parallel works and exact dependencies are shown in the original diagram.

Original schedule: months 1–6Original schedule: months 7–12