Commercial / 03
Hotel Rakat
Engineering, procurement and construction using the EPC method
Urikzor Street, Yakkasaray district, Tashkent
About the project
A hotel with a lobby and standard, junior suite and suite rooms. The catalogue presents the building’s architecture and interior designs.
The presentation reports that the project is in progress. Status as of the document date.
Source: EPC Format catalogue, p. 19–24.
- Scope
- Engineering, procurement and construction using the EPC method
- Total area
- 2 400 m²
- Duration stated in company materials
- 12 months
- Land area
- 400 m²
- Structure
- Reinforced concrete
- Capacity
- 54 people
Project in detail
Gallery 09
Open an image to explore the details.
Exteriors
Interiors
Let’s start with your idea
Let’s discuss your project
Tell us about your plans. Together, we’ll define the next step.
Discuss a project 